Waste Reception
Reception of ship-generated waste
Arranged by MARPOL annex, declared in advance and logged on arrival.
Overview
Reception by annex
Atlantic Barge arranges waste reception under the six annexes of MARPOL, the International Convention for the Prevention of Pollution from Ships. Each annex is received at its own station, against its own documentation.
Annex I
Oil
Oily bilge water, sludge and oil residues.
Reception. By hose, against a signed declaration and an entry in the vessel’s Oil Record Book.
Annex II
Noxious liquid substances
Noxious liquid substances and residues, where carried.
Reception. By prior arrangement only, with full product details declared in advance.
Annex III
Harmful substances in packaged form
Paints, solvents, sealants and other packaged substances classified as harmful.
Reception. In original, labelled packaging, with safety data sheets where available.
Annex IV
Sewage
Black and grey water from holding tanks.
Reception. By hose, to a standard discharge connection.
Annex V
Garbage
Food waste, plastics, domestic waste, cooking oil and operational waste, as recorded in the vessel’s Garbage Record Book.
Reception. Segregated by category before coming alongside, as recorded in the Garbage Record Book.
Annex VI
Air pollution
Emissions from ships.
Reception. Not applicable to reception on station.
Documentation
Waste declaration and receipt
A Waste Declaration (Form SD-2) is completed for every transfer, in addition to the vessel’s own record books. A receipt is issued to the vessel on completion.
SD-2.1 The declaration is signed by the master or by the officer in charge of the transfer.
SD-2.2 Quantities are recorded in cubic metres, by annex and category.
SD-2.3 The applicable annex and category are entered by the vessel before the transfer begins.
SD-2.4 A signed receipt is returned to the vessel for its records.
Scope. Reception is arranged by enquiry and cannot be booked through this website. Vessels remain responsible for compliance with MARPOL and with their own garbage management plan at all times.
